{"id":14459,"date":"2024-12-17T11:10:45","date_gmt":"2024-12-17T11:10:45","guid":{"rendered":"https:\/\/www.pedlex.com\/?p=14459"},"modified":"2025-08-11T12:51:45","modified_gmt":"2025-08-11T12:51:45","slug":"altium-packaging-transforms-its-workspace-with-pedlex-modular-offices","status":"publish","type":"post","link":"https:\/\/www.pedlex.com\/en\/altium-packaging-transforms-its-workspace-with-pedlex-modular-offices\/","title":{"rendered":"Altium Packaging transforms its workspace with Pedlex modular offices"},"content":{"rendered":"<h2>Client testimonial &#8211; Pedlex delivers modular offices for Altium Packaging<\/h2>\n<p style=\"text-align: left;\">Pedlex recently worked in collaboration with <a href=\"https:\/\/altiumpkg.com\/\">Altium Packaging<\/a> in order to optimize their work environment at their Anjou facility. Our client was looking to add workspace to their production center, and the result was a modular prefabricated office system, offering a calm and ergonomic space in their premises.<\/p>\n<p style=\"text-align: center;\"><iframe loading=\"lazy\" title=\"YouTube video player\" src=\"https:\/\/www.youtube.com\/embed\/of4MWCCIBPg?si=ByWwWVBDzEDmeVz2\" width=\"560\" height=\"315\" frameborder=\"0\" allowfullscreen=\"allowfullscreen\" data-mce-fragment=\"1\"><\/iframe><\/p>\n<h4><b>The challenge:\u00a0<\/b><\/h4>\n<p>Altium Packaging was looking to increase its <strong>work and organization capacity<\/strong> for its teams. Specifically, they needed to build <strong>soundproof workspaces for supervisors<\/strong>, protected from dust and machinery.<\/p>\n<p>This required the installation of four new offices in their manufacturing center. Our customer preferred an efficient installation to <strong>avoid time-consuming construction<\/strong>.<\/p>\n<h4><b><br \/>\nThe solution: (<em>the article is available in French only for the moment<\/em>)<\/b><\/h4>\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-14450\" src=\"\/wp-content\/uploads\/2024\/12\/Pedlex-bureau-modulaire-prefabrique-Altium_2.jpeg\" alt=\"\" width=\"340\" height=\"255\" \/>\u00a0 \u00a0<img loading=\"lazy\" decoding=\"async\" class=\" wp-image-14448\" src=\"\/wp-content\/uploads\/2024\/12\/Pedlex-bureau-modulaire-prefabrique-Altium_.jpeg\" alt=\"Exp\u00e9rience client Pedlex bureau modulaire pr\u00e9fabriqu\u00e9 Altium\" width=\"340\" height=\"255\" \/>\u00a0 <img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-14456\" src=\"\/wp-content\/uploads\/2024\/12\/Pedlex-bureau-modulaire-prefabrique-Altium_3.jpeg\" alt=\"Pedlex bureau modulaire pr\u00e9fabriqu\u00e9 Altium\" width=\"340\" height=\"255\" \/><\/p>\n<p>Our project manager worked closely with the Altium team to <strong>design a solution tailored to their needs<\/strong>.<\/p>\n<p>Pedlex&#8217;s experts supplied and installed 4 prefabricated offices, which <strong>took just 3 days to assemble<\/strong>. Installation is efficient, and the structures are <strong>modular and reusable<\/strong> in the event of relocation or expansion.<\/p>\n<p>Once the material had been delivered to our customer&#8217;s premises, the steps involved in assembling the modular offices included:<\/p>\n<ol>\n<li>\u00a0 Fixing the <strong>mounting rail<\/strong> to the floor<\/li>\n<li>\u00a0Placing <strong>panels<\/strong> along the mounting rail, following the assembly plan<\/li>\n<li>\u00a0<strong>Solid panels<\/strong> run along the rear walls<\/li>\n<li>\u00a0Other panels contain doors, windows or walls and <strong>reduce external noise by 25db to 40db<\/strong>, depending on model<\/li>\n<li>\u00a0<strong>Fasten panels<\/strong> to corner posts with clips or spacers<\/li>\n<li>\u00a0Installation of <strong>roof platforms<\/strong> with optional <strong>false floor<\/strong> and floor finishes<\/li>\n<li>\u00a0<strong>Frequent quality control<\/strong> and conformity to drawings<\/li>\n<li>\u00a0Insertion of snap-on joint <strong>covers<\/strong><\/li>\n<li>\u00a0Once our installation experts have completed these steps, the offices are <strong>ready to be furnished<\/strong> and <strong>receive electrical wiring<\/strong> and heating or air conditioning.<\/li>\n<\/ol>\n<h4><b><br \/>\nThe testimonial:<\/b><\/h4>\n<p>Our customer Altium expressed satisfaction with the efficiency of our collaboration:<\/p>\n<blockquote><p>\u00ab The Pedlex team were with us from start to finish.<br \/>\nTheir advice helped us find the space to fit out our protected areas within our premises.<br \/>\nThe project was delivered on time, with impeccable installation quality.<i>\u00a0<\/i>\u00bb<\/p><\/blockquote>\n<p>Optimize your workspace with Pedlex &#8211; the expert in customized industrial equipment solutions!<\/p>\n<hr \/>\n<p><a href=\"http:\/\/www.pedlex.com\/contact\" target=\"_blank\" rel=\"noopener\"><u>Contact us<\/u><\/a> for a customized solution<\/p>\n<p>Discover our <a href=\"https:\/\/www.pedlex.com\/product\/bureaux-modulaires-structures-prefabriquees\/\">modular in-plant offices<\/a> here.<\/p>\n<p>Come and see our showroom in Anjou to discover all the storage products we keep in stock!<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Client testimonial &#8211; Pedlex delivered prefab modular offices for Altium Packaging in order to optimize their work environment at their Anjou facility. Discover the turnkey project here<\/p>\n","protected":false},"author":3,"featured_media":55968,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"content-type":"","om_disable_all_campaigns":false,"inline_featured_image":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[65],"tags":[],"class_list":["post-14459","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-en"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.pedlex.com\/en\/wp-json\/wp\/v2\/posts\/14459","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pedlex.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pedlex.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pedlex.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pedlex.com\/en\/wp-json\/wp\/v2\/comments?post=14459"}],"version-history":[{"count":3,"href":"https:\/\/www.pedlex.com\/en\/wp-json\/wp\/v2\/posts\/14459\/revisions"}],"predecessor-version":[{"id":55971,"href":"https:\/\/www.pedlex.com\/en\/wp-json\/wp\/v2\/posts\/14459\/revisions\/55971"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pedlex.com\/en\/wp-json\/wp\/v2\/media\/55968"}],"wp:attachment":[{"href":"https:\/\/www.pedlex.com\/en\/wp-json\/wp\/v2\/media?parent=14459"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pedlex.com\/en\/wp-json\/wp\/v2\/categories?post=14459"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pedlex.com\/en\/wp-json\/wp\/v2\/tags?post=14459"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}